Skip to main content

If you have questions, comments or are looking for additional information, please contact:

Neil Dobler
Bartlett & West
(785) 272-2252
neil.dobler@bartwest.com

Kimberly Qualls
KDOT, Public Affairs Manager
(785) 296-3881
kqualls@ksdot.org

Debbie Tanking, PE
Road Design
Kansas Department of Transportation
(785) 296-0269
debbiet@ksdot.org

Find Us Online:

View & Comment on the Preferred Alternative and Future Design Consideration

We want your thoughts regarding the Preferred Alternative and Future Design Consideration for improvements to the I-70 Polk-Quincy Viaduct and surrounding area.

Download, print and mail comment card or complete the online form below.

* Required

Preferred Alternative:

The Preferred Alternative creates an access system with two "split diamond" interchanges, one serving the north side of the downtown area and one serving the east side.

View Preferred Alternative Details (pdf will open in a new tab or window)

Do you have comments on the Preferred Alternative?


Future Design Consideration:

The City Council has requested that KDOT consider a modification of the Preferred Alternative that would eliminate the proposed entrance ramp from 6th Avenue to eastbound I-70 and provide instead an exit ramp from eastbound I-70 that would connect to Monroe Street north of 10th Avenue. KDOT will analyze this modification during the preliminary design phase of the improvements.

View Future Design Consideration Details (pdf will open in a new tab or window)

Do you have comments on the Future Design Consideration?


About You

   
  Submit   Reset
Did You Know?